Debt
Chat
16 114

Service Catalog

Installation of internal network

The internal network installation implies arraignment of an internal network point from the customer owned metering unit up to the natural gas device.

The distribution licensee shall install an internal network of a new low-pressure household customer (with 0-6m3/h capacity) upon request within the cost of connection. Above the mentioned capacity, the customer shall arrange the internal network or install additional points at his/her own expense.

The cost of connection to a distribution network is regulated by Decree #12 of Georgian National Energy and Water Supply Regulatory Commission, dated July 9, 2009 (Annex 1